Past Projects - Vertical

   
Army Aviation Support
 

Project Title: Army Aviation Support Facility

Location: Hunter Army Airfield, Georgia

Contract Value: $16,320,000

Description:

Construction of high bay helicopter maintenance hangar with long span steel trusses and adjoining two story shop/office area, including substantial masonry construction, standing seam metal roofing and siding, and hangar doors.  Also includes site development and airfield concrete pavement. 

Army Aviation Support  Facility
Click Thumbnail for Large View

Army Aviation Support  Facility
Click Thumbnail for Large View

Army Aviation Support  Facility
Click Thumbnail for Large View
 
Army Aviation Support  Facility
Click Thumbnail for Large View
 
Army Aviation Support  Facility
Click Thumbnail for Large View
 
Army Aviation Support  Facility
Click Thumbnail for Large View

reddividerbar
 
POL Storage Complex
Pope Air Force Base - North Carolina
 
 

Project Title: POL Storage Complex
 
Location:  Pope Air Force Base, North Carolina

Contract Value: $11,206,331

Date of Completion: August 2006

Description:

This project involved construction of an aircraft fueling complex.  Project included construction of two unique concrete encased 10,000 gal fabricated steel in-ground storage tanks, fuel distribution piping, new admin/ops building, filter building, two pump houses, and fuel truck fill stands and canopy, site work including storm drainage, utilities, lighting and hardstand, and demolition of existing fueling complex. 

POL
Click Thumbnail for Large View
POL Project
Click Thumbnail for Large View

POL Project
Click Thumbnail for Large View
 
POL Project
Click Thumbnail for Large View
 
POL Project
Click Thumbnail for Large View
 
POL Project
Click Thumbnail for Large View

reddividerbar
 
Ammo Holding Area
Ft. Bragg, North Carolina

Project Title: Ammo Holding Area
 
Location:  Ft. Bragg, North Carolina

Contract Value: $13,787,170

Date of Completion: May 2004

Description:

Construction of seven heavily reinforced concrete munitions storage magazines totaling over 11,000 CY with blast doors similar in construction to hangar doors, two 20,000SF high bay steel framed storage buildings with standing seam metal roofing and siding for tractor-trailer trucks, two small conventional buildings, concrete hardstand and road, and related site development, utilities, and electrical work. 

 
 
reddividerbar
 
 
Upgrade Saber Hall
Hunter Army Airfield, GA

 

Project Title: Upgrade Saber Hall

Location: Hunter Army Airfield, Georgia

Contract Value: $23,755,648

Description:

Expansion and renovation of Army Ranger staging complex in two phases.  Phase I included construction of IRC Building (approximately 19,000SF),  Ranger Rigging Building (approximately 18,000SF), Ranger  Warehouse (approximately 15,000SF), several smaller  structures, extensive site improvements including a 200,000  gal. elevated water storage tank, and extensive concrete  pavements.  The IRC, Rigging and Warehouse Buildings all are constructed alike, with reinforced concrete foundations and floor slabs, high bay steel framing, masonry walls, and standing seam metal roofing and siding.  Phase II included renovations of an existing building (approximately 33,000SF) including a SIPERNET space, and additional site improvements and concrete pavements.

 